Blacklisted Entities

# Blacklisted Entity Blacklisting Agency Project Offense/s Sanction/s Period
1 Julieta N. Clemente - Owner/Manager, RC Construction and Realty City of Zamboanga - Office of the City Legal Officer Construction of Shoreline Protection at Malandi, Patalon, City of Zamboanga Termination of Contracts in reference to III A(2)(a) and (c)(i) of the Guidelines on Termination of Contracts of the handbook on Philippine Government Procurement, 2016 Revised IRR of RA 9184 and the latest GPPB Issuance which provides: III A (2)(a) Due to the Contractor`s fault and while the project is ongoing, it has incurred negative slippage of fifteen percent (15%) or more in accordance with Presidential Decree 1870; and III A (2)(c)(i) abandons the contract works, refuses or fails to comply with a valid instruction of the Procuring Entity or fails to proceed expeditiously and without delay despite a written notice by the Procuring Entity; (emphasis supplied). In relation to (b), (f), and (g) of Number 4.2 of Appendix 17 Uniform Guidelines for Blacklisting of Manufacturers, Suppliers, Distributors, Contractors and Consultants pertinently provides: (b) Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause One (1) Year Blacklisting / -
2 Tribu Design & Construction Bureau of Fire Protection - Regional Office I Construction of Dasol Fire Station Based on the Notice of Termination of Contract dated 05 March 2019, the construction was not yet completed and incurred a negative slippage of thirty - five percent (35%) even after the lapsed of more than sixteen (16) months, contrary to the agreement entered into by parties. One (1) Year Blacklisting 07/15/2019 -
3 Four Brothers Construction Bureau of Fire Protection - Regional Office I Construction of Pagudpud Fire Station Based on the Notice of Termination of Contract dated 11 March 2019, the construction was not yet completed and incurred a negative slippage of Fifty - eight and Sixty - eight hundredths percent (58.68%) even after the lapsed of more than nineteen (19) months, contrary to the agreement entered into by parties. One (1) Year Blacklisting 07/15/2019 -
4 F.V. SANGALANG CONSTRUCTION Castillejos Water District Construction of Castillejos Water District Administrative Building Failure to comply with the conditions and requirements of the contract during the implementation which resulted to a negative slippage of more that fifteen percent (15%). Failure to complete the project within the 240 Calendar days, in violation of the contract agreement. One (1) Year Blacklisting 06/14/2019 - 06/15/2020
5 VERZONTAL BUILDERS, INC. Department of Finance Renovation of DOF Offices - 8th Floor EDPC Building Package 4 (PB 17-192-5) For the procurement of infrastructure projects, poor performance by the contractor or unsatisfactorily quality and/or progress of work arising from his fault or negligence as reflected in the performance monitoring system of the procuring entity shall be applied. Any of the following acts by the constructor shall be construed as poor performance: i.) Negative slippage of 15% and above within the critical path of the project due entirely to the fault or negligence of the contractor; xxx One (1) Year Blacklisting 06/18/2019 - 06/17/2020
6 CDJ Builders and Construction Supplies Municipality of Gasan, Province of Marinduque Construction of Gasan Public Market (Main Building - Phase I) Failure to deliver and comply with the conditions stipulated in the project contract. One (1) Year Blacklisting 06/27/2019 - 06/26/2020
7 Atlantic Erectors, Incorporated Department of Budget and Management - Procurement Service Supply and Delivery of Systematic Replacement of Compressor Motor Control Unit (CMCU) for the Light Rail Transit Authority (LRTA) (PB No. 19-056-5) Php68,420,000.00 Submission of bids that contain false information or falsified documents, or the concealment of such information in the bids in order to influence the outcome of eligibility screening or any other stage of the public bidding consistent with the grounds under Item 1 and Item 2 of Appendix 17 of the 2019 Revised Implementing Rules and Regulations of the Government Reform Act One (1) Year Blacklisting 06/28/2019 - 06/28/2020
8 Mr. Pepito T. Espinosa, Sole proprietor of John Arne Construction Metals Industry Research and Development Center Supply of Labor, Materials, Tools, Equipment and Technical Supervision for the Renovation of Gold Building Offices and Laboratories to include: CRO to Library, ATD-DHO to instrumentation Laboratory at Ground Floor, Chemical Laboratory and Chapel at Second Floor - Negotiated 1. Due to the contractor`s fault and after the contract time has expired, it has incurred a negative slippage of ten percent (10%) or more in the completion of the work; 2. The contractor abandons the contract work, refuses or fails to comply with a valid instruction of the Procuring Entity or fails to proceed expeditiously and without delay despite a written notice by the Procuring Entity; 3. The contractor neglects or refuses to remove materials; and 4. The delay in the completion of the works exceeds a time duration equivalent to ten percent (10%) of the specified contract time plus any time extension granted to the contractor. One (1) Year Blacklisting 07/01/2019 - 06/30/2020
9 Mr. Lee Collette
Vice President
Nightline Inc. and
Mr. Melon Carlo M. Santiago
Authorized Representative
Commanding General of the Philippine Army - Armed Forces of the Philippines Supply and Delivery of One (1) Lot CEIS Equipment - Procurement of 42 pcs Infrared Aiming Circle Device, 3 in 1 and 28 pcs Night Vision Googles and Binocular Night Vision Device. Failure to fully and faithfully comply with the contractual obligations without valid cause. One (1) Year Blacklisting 07/02/2019 - 07/02/2020
10 JAREX Industrial Sales and Marine Services, Inc. Department of Budget and Management - Procurement Service Supply and Delivery of Fire Extinguisher, Pure HCFC for the Procurement Service (18-00039-CSE) Php10, 670,645.00) Contract Termination for Default (Failure to deliver or perform any or all of the Goods within the period(s) specified in the contract). One (1) Year Blacklisting 07/03/2019 - 07/03/2020
11 Victoriano C. Lim Construction National Irrigation Administration Contract No. NISRIPD-C-13, Rehabilitation and Improvement of Main Canal from Sta. 4+828 - Sta. 11+641 including 12 lateral canals and 15 Checks and Weirs (Lambayong River Irrigation System Package 3) under National Irrigation Sector Rehabilitation and Improvement Project (NISRIP) Termination for Default of Contractor Two (2) Years Blacklisting 07/10/2018 - 07/08/2020
12 Fatima ASK Construction City of Zamboanga Construction of Health Center at Pangapuyan, Zamboanga City a.) Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction by the procuring entity pursuant to the implementation of the contract, b.) Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the Constructor`s Performance Evaluation System, and c.) Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. Two (2) Years Blacklisting 07/13/2018 - 07/14/2020
13 Andromeda Construction Services and Supply Clark Development Corporation Road and Drainage Improvement in front of ECELL Section 69.1.a of the IRR of RA 9184 Two (2) Years Blacklisting 07/16/2018 - 07/15/2020
14 R.S. Sepian Construction and Trucking Department of Public Works and Highways Central Office (DPWH CO) Contract ID No. 15P00033, Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide along Abra-Kalinga Road, K0460+000-K0461+000, et. Al, Licuanan Abra Termination of Contract due to the fault of the contractor (negative slippage of more than 15%) One (1) Year Blacklisting 07/19/2019 - 07/18/2020
15 Sumag Builders Construction Vice Chief of Staff - Armed Forces of the Philippines Repair and Renovation of Gen. Vicente Lim Hall of AFPETDC The Contractors does not have on the project site the minimum essential equipment listed on the Bid necessary to prosecute the Works in accordance with the approved work plan and equipment deployment schedule as required for the project. One (1) Year Blacklisting 07/26/2019 - 07/26/2020
16 PAAC Construction and Mechanical Services Authority of the Freeport Area of Bataan Replacement: SFB Ceiling Eaves, Gutter and Downspouts a.) Termination of contract due to the default of the contractor pursuant to Appendix I (Guidelines on Termination of Contracts) in relation to Section 6.0 of Appendix 17, of the revised Implementing Rules and Regulations (IRR) of the Republic Act No. 9184 (Uniform Guidelines for Blacklisting). - Contract was terminated for default of contractor and Order of Termination was issued on 22 July 2019 and duly received by contractor`s representative on 27 July; b.) Poor performance by the contractor due to its own fault or negligence having incurred negative slippage of more than 15% during the contract implementation stage and more than 10% negative slippage after the contract time as expired (4.2.f.i Appendix I) - There is a negative slippage of 10% and the Liquidated Damages has reached 13.19%; and c.) Willful or deliberate abandonment or non-performance of the project (4.2.g Appendix 17) and failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause (4.2.b Appendix 17) - No ongoing work. Ceiling eaves at SFB 10 are left open. One (1) Year Blacklisting 07/28/2019 - 07/27/2020
17 EMRA Construction and Supply Services Police Regional Office 5 - Philippine National Police Construction of Standard Police Station Building Type "B/C" Two Storey with Roofdeck and Roofing a.) Termination of Contract due to default of the contractor; b.) Negative slippage of more than 15%; and c.) The contractor abandons the contract work, refuses or fails to comply with a valid instruction of the Procuring Entity or fails to proceed expeditiously and without delay despite a written notice by the Procuring Entity. One (1) Year Blacklisting 08/01/2019 - 08/01/2020
18 Tomas B. Binbinon, Jr., SHARYSU Builders and Marketing Nueva Vizcaya State University (NVSU) Construction of Germ Plasm Screen House and Head House a.) Incurrence of a Negative Slippage of 56.81% in the completion of the work, after the contract time has expired due to the contractor`s fault; and b.) Failure of the contractor to execute the Works in accordance with the contract, and persistently or flagrantly neglecting to carry out its obligations under the contract. One (1) Year Blacklisting 08/05/2019 - 08/04/2020
19 L.M. Canlas Construction Department of Public Works and Highways - Central Office 1. 18BA0061 - Construction of Itbayat Provincial Hospital Building, Itbayat, Batanes Php14,823,200.13
2. 18BA0009 - Construction of Garayaw Road, Brgy. Sta. Rosa, Itbayat, Batanes Php987,486.63
3. 18BA0053 - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads; Mayan-Mauyen Port: K0004+900+K0005+026 Php2,296,706.14
Termination of contract due to the fault of the contractor (negative slippage of more than 15%) One (1) Year Blacklisting 08/07/2019 - 08/06/2020
20 Signum Audio Visual Lighting Corporation University of the Philippines - Los Banos UPLB-I-027-5-17 Rebid "Supply, Delivery and Installation of Tent using a Dome Type Truss Roofing System for OVCPD" with ABC amounting to Php1,995,000.00 For violation of Section 65.3 paragraph (a), and section 69.1, paragraph (a) in connection with the "submission of eligibility requirements containing false information or falsified documents" Two (2) Years Blacklisting 08/13/2018 - 08/12/2020
21 Lineaire Marketing and Airconditioning Services Philippine Health Insurance Corporation Procurement of One Lot Air Conditioning Units - One Million Three Hundred Ninety Two Thousand Ninety Pesos (php1,392,090.00) Termination of the contract due to the default of the bidder One (1) Year Blacklisting 08/13/2019 - 08/12/2020
22 Andromeda Construction Services and Supply Clark Development Corporation Proposed Groundsill with Slope Protection along Dolores Creek Section 40 of the IRR of RA 9184 Two (2) Years Blacklisting 08/31/2018 - 08/30/2020
23 DIOMAR TRADING, MA. JACKELOU LYN T. MAJADUCON - Proprietress / Owner Office of the Governor, Province of Antique Purchase Order No. MM-2018-055: Delivery of Anti-Rabies Serum 200 i.u/ml, 5ml Solution for injection Delivery of the counterfeit product which is violation of paragraph 4.2.d, Annex A of GPPB Resolution No. 40-2017 which states that, "For the procurement of goods, unsatisfactorily progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or unsatisfactorily or inferior quality of goods, as may be provided in the contract. One (1) Year Blacklisting 09/03/2019 - 09/03/2020
24 MLU Construction Department of Public Works and Highways Central Office (DPWH CO) Contract ID No. 17IH0084 - Rehabilitation of Rural Health Unit (RHU), San Isidro RHU, San Isidro, Northern Samar Termination of Contract due to the fault of the contractor (negative slippage of more than 15%) One (1) Year Blacklisting 09/16/2019 - 09/15/2020
25 NFH Construction & Supply Department of Public Works and Highways Central Office (DPWH CO) Contract ID No. 17FE0045 - Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges including ROW to more than 2 lanes, Pili Diversion Road Bridge 1 (B01182LZ) along Pili Diverson Road Termination of contract due to the fault of the contractor (negative slippage of more than 15%) One (1) Year Blacklisting 09/16/2019 - 09/15/2020
26 Mr. Rodel Lloyd Bernardez, SAW-AN CONSTRUCTION City Government of Baguio Construction of 4 - Storey 4 - Laboratory Workshop Rooms (Phase I) at Joaquin Smith National High School Termination of contract due to the default of the bidder (Par. (A)(2)(c) of Item III of Annex "I" of the Revised Implementing Rules and Regulations of R.A. 9184 and Item 4.2 of the Uniform Guidelines for Blacklisting of Contractors). The contractor: abandons the contract works, refuses or fails to comply with a valid instruction of the Procuring Entity or fails to proceed expeditiously and without delay despite a written notice by the Procuring Entity. One (1) Year Blacklisting 09/18/2019 - 09/17/2020
27 FERJAN Health Link Enterprises City of Zamboanga Delivery of Supplies for Drugs and Medicine; Medical, Dental, and Laboratory Supplies PR No. 100-17-10-2599/Sol. No. 17-1109-0249 and PR No. 100-17-6-1654/Sol. No. 17-0629-0152 Non-fulfillment of delivery of supplies for drugs and medicines Two (2) Years Blacklisting 09/25/2018 - 09/26/2020
28 Alliance Auto & Truck Rebuilders Inc. Philippine Amusement and Gaming Corporation Supply and Delivery of One (1) Unit Delivery Truck under ITB No. FB18-02-007CORb-10 Failure to post the required Performance Security within the prescribed period One (1) Year Blacklisting 09/27/2019 - 09/26/2020
29 Jozeth Trading Department of Education Region III - Central Luzon Supply and Delivery of 2-Seater Student Table and Chair Set and Teachers` Table and Chair Set for Elementary School, Junior High School and Senior High School, under CY 2018 BEFF, with Contract No. 2018-08-062, having a contract amount of Php151,547,793.60 Termination of the contract due to the default of the bidder/supplier. One (1) Year Blacklisting 10/15/2019 - 10/14/2020
30 JAL Pharmaceutical and Medical Distributor Bureau of Jail Management and Penology - NCR Procurement of Various Drugs and Medicines for BJMP-NCR Inmates (December 2018) ABC: Php2,808,534.00 Non-completion of Delivery amounting Two Million Two Hundred Thirty-Nine Thousand Six Hundred Fifty-One Pesos (Php2,239,651.00) or 79.75% of the Contract One (1) Year Blacklisting 10/23/2019 - 10/23/2020
31 EGB & Associates Corp. Department of Budget and Management - Procurement Service a.) Service Provider for the Department of Education (DepEd) Preparation of School Site Development Plan for the DepEd (CAR and Region I) (PB No. 18-298-5) Php27,473,052.39
b.) Service Provider for the Department of Education (DepEd) Preparation of School Site Development Plan for the DepEd (Region II and Region III) (PB No. 18-229-5) Php30,217,977.46
c.) Service Provider for the Department of Education (DepEd) Preparation of School Site Development Plan for the DepEd (Region IV-A) (PB No. 18-300-5) Php17,558,233.79
Submission of bids that contains false information or falsified documents, or the concealment of such information in the bids in order to influence the outcome of eligibility screening or any other stage of the public bidding consistent with the grounds under Item 1 and Item 2 of Appendix 17 of the 2016 Revised Implementing Rules and Regulations of the Government Reform Act One (1) Year Blacklisting 10/30/2019 - 10/29/2020
32 Kwan Sing Construction Corporation Department of Transportation M`lang Airport Development Project - Rebid Submitting falsified documents for the purpose of unduly influencing the outcome of the biddings. One (1) Year Blacklisting 11/02/2019 - 11/03/2020
33 HEXAMINDZ CORPORATION Department of Transportation Construction of Brgy. Valencia Port in Cagdianao, Dinagat, Islands Failure to comply with the conditions and requirements of the contract during the implementation, which resulted to a negative slippage of more than fifteen percent (15%). One (1) Year Blacklisting 11/04/2019 - 11/05/2020
34 HEXAMINDZ CORPORATION Department of Transportation Construction of Brgy. Sta. Rita Port in Cagdianao, Dinagat Islands Failure to comply with the conditions and requirements of the contract during the implementation, which resulted to a negative slippage of more than fifteen percent (15%). One (1) Year Blacklisting 11/04/2019 - 11/05/2020
35 IVAXX Marketing Corporation Department of Health - Regional Office XI Item No. 1 (Pediatric Bed, Brand New, Branded) of Package 13 - Supply and Delivery of Medical Bed/Cabinets/Stretchers/Tables/Carts under ITB No. 2018-009 Bidder committed acts resulting forfeiture of bid security under Section 69.1 (d) - Bidder refuses to accept award, or enter into cotract with the Government without justifiable cause, after he had been adjudged as having submitted the Lowest Calculated Responsive Bid - in blatant violation on the Guidelines on the Use of Bid Securing Declaration. Two (2) Years Blacklisting 11/08/2018 - 11/08/2020
36 PEA Drug Department of Health Procurement of Cotrimoxazole under SVP No. 2018 - 044 Refusal to accept an award One (1) Year Blacklisting 11/14/2019 - 11/14/2020
37 Mr. Reynaldo L. Lundang / R.L. Lundang Construction Tarlac Agricultural University Contract Reference No. 2018-001 entitled "Construction of I.T. Data Center" Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. One (1) Year Blacklisting 11/16/2019 - 11/15/2020
38 Gulf-Canary Construction & Development Inc. / Ms. Cherry Prudence C. Jao National Irrigation Administration Cadaclan Pasayacan CIS Resto. / Rehab. / Repair of Existing Irrigation System Fund / CY 2018 under Contract No. INIMO-2017-12-039 a. Incurrence of a negative slippage of more than ten percent (10%) in the completion of the work, after the contract time has expired due to the contractor`s fault; b. Refusal or failure of the contractor to comply with the valid instructions of the Procuring Entity, and failure to proceed expeditiously and without delay despite a written notice by the Procuring Entity; and c. Failure of the contractor to execute the Works in accordance with contract, and persistently or flagrantly neglecting to carry out its obligations under the contract. One (1) Year Blacklisting 11/19/2019 - 11/19/2020
39 ACCV Builders / Engr. Freddie D. Riton National Irrigation Administration Laoag-Vintar RIS, Package 2/Resto. / Rehab. / Repair of Existing Irrigation System Fund / GAA / CY 2018 under Contract No. INIMO-2018-02-026 a. Incurrence of a negative slippage of more than fifteen percent (15%) while the project is on-going due to the contractor`s fault in accordance with Presidential Decree 1870; b. Refusal or failure of the contractor to comply with the valid instructions of the Procuring Entity, and failure to proceed expeditiously and without delay despite a written notice by the Procuring Entity; and c. Failure of the contractor to execute the Works in accordance with contract, and persistently or flagrantly neglecting to carry out its obligations under the contract. One (1) Year Blacklisting 11/19/2019 - 11/19/2020
40 Zedik Builders / Mr. John A. Quidez National Irrigation Administration Resto. / Rehab. / Repair of Existing Laoag-Vintar RIS under Contract No. R1-INIMO-17-03-051 a. Incurrence of a negative slippage of more than ten percent (10%) in the completion of the work, after the contract time has expired due to the contractor`s fault; b. Refusal or failure of the contractor to comply with the valid instructions of the Procuring Entity, and failure to proceed expeditiously and without delay despite a written notice by the Procuring Entity; and c. Failure of the contractor to execute the Works in accordance with contract, and persistently or flagrantly neglecting to carry out its obligations under the contract. One (1) Year Blacklisting 11/19/2019 - 11/19/2020
41 Zedik Builders / Mr. John A. Quidez National Irrigation Administration Resto. / Rehab. / Repair of Existing Laoag-Vintar RIS under Contract No. R1-INIMO-17-03-052 a. Incurrence of a negative slippage of more than ten percent (10%) in the completion of the work, after the contract time has expired due to the contractor`s fault; b. Refusal or failure of the contractor to comply with the valid instructions of the Procuring Entity, and failure to proceed expeditiously and without delay despite a written notice by the Procuring Entity; and c. Failure of the contractor to execute the Works in accordance with contract, and persistently or flagrantly neglecting to carry out its obligations under the contract. One (1) Year Blacklisting 11/19/2019 - 11/19/2020
42 JBRC Construction Corp. / Ms. Rhodora B. Bueno National Irrigation Administration Sulvec SRIP (Package 4) under Contract No. R1-INIMO-18-03-061 a. Incurrence of a negative slippage of more than ten percent (10%) in the completion of the work, after the contract time has expired due to the contractor`s fault; b. Refusal or failure of the contractor to comply with the valid instructions of the Procuring Entity, and failure to proceed expeditiously and without delay despite a written notice by the Procuring Entity; and c. Failure of the contractor to execute the Works in accordance with contract, and persistently or flagrantly neglecting to carry out its obligations under the contract. One (1) Year Blacklisting 11/19/2019 - 11/19/2020
43 JBRC Construction Corp. / Engr. Rhodora B. Bueno National Irrigation Administration Sulvec SRIP (Package 5) under Contract No. R1-INIMO-18-11-078 a. Incurrence of a negative slippage of more than ten percent (10%) in the completion of the work, after the contract time has expired due to the contractor`s fault; b. Refusal or failure of the contractor to comply with the valid instructions of the Procuring Entity, and failure to proceed expeditiously and without delay despite a written notice by the Procuring Entity; and c. Failure of the contractor to execute the Works in accordance with contract, and persistently or flagrantly neglecting to carry out its obligations under the contract. One (1) Year Blacklisting 11/19/2019 - 11/19/2020
44 Schema Konsult, Inc. / Mr. Manolo G. Dador National Irrigation Administration Consulting Services for the Feasibility Study of the proposed Quiom-Maypalig Small Reservoir Irrigation Project under Contract No. R1-INIMO-15-08-138 a. Failure of the Consultant to deliver or perform the outputs and Deliverables outside of force majeure within the period specified in the contract, or within any extension thereof granted by the Procuring Entity pursuant to a request made by the Consultant prior to the delay; b. Failure of the Consultant to comply with the instruction of theprocuring entity for the renewal of the effectivity dates of the performance security after its expiration during the course of contract implementation. One (1) Year Blacklisting 11/19/2019 - 11/19/2020
45 Tramat Mercantile, Inc. / Ms. Elizabeth C. Velasco National Irrigation Administration Water Augmentation Through Drilling Rigs (Procurement of Mobile Drilling Rig) under Contract No. R1-RIO-17-10-154 a. Failure of the Supplier to deliver the Good outside of force majeure within the period specified in the contract, or within any extension thereof granted by the Procuring Entity pursuant to a request made by the Supplier prior to the delay; and such failure amounts to at least (10%) of the contract price; b. Failure of the Supplier to perform any other obligation under the Contract. One (1) Year Blacklisting 11/19/2019 - 11/19/2020
46 Julieta N. Clemente - Owner/Manager, RC Construction and Realty City of Zamboanga - Office of the City Legal Officer Construction of Shoreline Protection at Balicacas, Patalon, City of Zamboanga Termination of Contracts in reference to III A(2)(a) and (c)(i) of the Guidelines on Termination of Contracts of the handbook on Philippine Government Procurement, 2016 Revised IRR of RA 9184 and the latest GPPB Issuance which provides: III A (2)(a) Due to the Contractor`s fault and while the project is ongoing, it has incurred negative slippage of fifteen percent (15%) or more in accordance with Presidential Decree 1870; and III A (2)(c)(i) abandons the contract works, refuses or fails to comply with a valid instruction of the Procuring Entity or fails to proceed expeditiously and without delay despite a written notice by the Procuring Entity; (emphasis supplied). In relation to (b), (f), and (g) of Number 4.2 of Appendix 17 Uniform Guidelines for Blacklisting of Manufacturers, Suppliers, Distributors, Contractors and Consultants pertinently provides: (b) Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause Two (2) Years Blacklisting 11/27/2018 - 11/28/2020
47 Hexaminds Corporation Provincial Government of South Cotabato Concreting of Tubi-ala – Lambontong Road particularly approaching to Malomboy Bridge (a.) Due to the Contractor`s fault and after the contract time has expired, it has incurred a negative slippage of ten percent (10%) or more in the completion of the work; (b.)The contractor abandons the contract works, refuses or fails to comply with a valid instruction of the Procuring Entity or fails to proceed expeditiously and without delay despite a written notice by the Procuring Entity; (c.) The contractor does not actually have on the project site the minimum essential equipment listed on the Bid necessary to prosecute the Works in accordance with the approved work plan and equipment deployment schedule as required for the project; (d.) The contractor does not execute the Works in accordance with the contract or persistently or flagrantly neglects to carry out its obligations under the contract. One (1) Year Blacklisting 12/16/2019 - 12/15/2020
48 Granby Trading and Construction Department of Transportation M`lang Airport Development Project - Rebid Submitting falsified documents for the purpose of unduly influencing the outcome of the biddings. One (1) Year Blacklisting 12/14/2019 - 12/15/2020
49 Cebu Business Materials Trading Company Inc. Bureau of Jail Management and Penology - NCR Procurement of Rehabilitation Supplies (Yellow T- Shirt) for BJMP - NCR Inmates 1st Semester 2019 Non-completion of Delivery Amounting Three Million Fifty - One Thousand Seventy Eight Pesos and 75/100 (Php 3,051,078.75) or 83.79% of the Contract One (1) Year Blacklisting 12/18/2019 - 12/18/2020
50 Alberto V. Mendoza, AV Mendoza Enterprises Department of Public Works and Highways - Isabela 4th District Engineering Office Furnishing of various electrical supplies (parts of the Generator with Mobilization and Labor) for use in the DPWH Isabela 4th District Engineering Office Submission of falsified documents One (1) Year Blacklisting 01/01/2020 - 12/31/2020
51 Mr. Jeb John C. Constancio, General Manager, Organic Construction and Aggregates Philippine National Police - Police Reginal Office - Cordillera Construction of Natonin Standard Type B/C MPS Building Constructor`s Fault and for incurring negative slippage of more than fifteen percent (15%). a.) All excavated footings were not executed in accordance with the plans and specifications particularly on the depth and alignment to include the intermediate columns. b.) All reinforcing bars of the installed columns were reduced/cut-off to its commercial length. One (1) Year Blacklisting 01/01/2020 - 12/31/2020
52 Clarklui Enterprises Department of the Interior and Local Government Procurement of SGLG Markers under Purchase Order (PO) No. 2019-334 Failure to fully and faithfully comply with obligations without valid cause/ failure to comply with any written lawful instructions of this department specifically on the following acts: a.) Unable to deliver the four hundred (400) SGLG Markers on or before November 04, 2019 Awarding Ceremony contrary to the PO and undertaking with the BLGS. b.) Has not notified the BLGS of its impeding non-delivery of the four hundred (400) SGLG markers, before or after November 04, 2019 Awarding Ceremony. c.) Has besmirched the reputation of the department not to mention the disappointment of the SGLG passers. d.) Did not comply with the technical specifications indicated on the PO. e.) Non delivery of the twenty (20) remaining blank markers on December 12, 2019. One (1) Year Blacklisting 01/08/2020 - 01/07/2021
53 The Nielsen Company (Philippines), Inc Bangko Sentral ng Pilipinas - Office of the General Counsel and Legal Services Job Order No. 4500005060 - One (1) Lot Supply for the Conduct of Household Debt Survey, as per BSP Terms of Reference, in the amount of PhP3,498,000.00 Termination of contract due to default of contractor/bidder One (1) Year Blacklisting 01/08/2020 - 01/08/2021
54 DHN Construction and Development Corporation University of the Philippines - Diliman Quezon City Proposed Conversion of CSLAB to CS Library Failure to perform obligations under the Project and having incurred a negative slippage of Thirty Eight Point Five Three Eight Three percent (38.5383%) in the Original Contract. and Fifty One point Two Nine One Four percent (51.2914%) in Variation Order No. 1 for the Project. One (1) Year Blacklisting 01/11/2020 - 01/10/2021
55 NORTHBAY CONSTRUCTION SERVICES CORPORATION Department of Transportation Maconacon Port Development Project - Construction of Pier, Rock Causeway with Stairlanding and Multi-Purpose Shed Failure to comply with the conditions and requirements of the contract during the implementation, which resulted to a negative slippage of more than fifteen percent (15%). Two (2) Years Blacklisting 01/11/2019 - 01/12/2021
56 Westfields Residences Inc. - Eurotel Hotel, Dinaga, Naga City Department of Social Welfare and Development Board and Lodging for the Conduct of Training for Operations and Maintenance (O&M) in Camarines Sur Lot 3 with an Approved Budget for the Contract (ABC) of One Hundred Fourteen Thousand One Hundred Pesos (P114,100.00) Failure to post a performance security One (1) Year Blacklisting 01/23/2020 - 01/23/2021
57 St. Gerrard Construction General Contractor and Development Corporation Department of Public Works and Highways - Central Office Contract ID No. 17DG0110 for the Construction of Four (4) Storey- Four (4) Units Laboratory /Workshop Building Termination of contract due to the fault of the contractor (negative slippage of more than 15%) One (1) Year Blacklisting 01/31/2020 - 01/30/2021
58 Double E Construction and Supplies City of Zamboanga Construction of Multi-Purpose Building at Don Pablo Memorial High School, Sta. Maria, Zamboanga City 1.) Due to the Contractor`s fault and while the project is ongoing, it has incurred negative slippage of fifteen percent (15%) or more; and 2.) Does not execute the works in accordance with the contract or persistently or flagrantly neglects to carry out its obligations under the contract. One (1) Year Blacklisting 01/29/2020 - 01/30/2021
59 Footprints Construction General Building, General Engineering Amai Pakpak Medical Center Contract for the Construction of Seven (7) Storey OB-Gyne and Pediatric Ward Building Phase II Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from the fault or negligence that resulted to the negative slippage of (~) 31.50% in the completion of work in violation of the contract and Annex "I", III(A) of the revised Implementing Rules and Regulations of the Government Procurement Reform Act (RA 9184). One (1) Year Blacklisting 02/01/2020 - 02/01/2021
60 Impexcos Co. Department of Health - Office of the Secretary Procurement of Safety Collector Boxes under IB No. 2018-038 Submission of Bids that contain false information or falsified documents, or the concealment of such information in the Bids in order to influence the outcome of eligibility screening or any other stage of the public bidding Two (2) Years Blacklisting 02/14/2019 - 02/14/2021
61 Mark Anthony Construction and Supply Davao Center for Health Development Construction of Davao Prison and Penal Farm Hospital Termination of the contract due to the default of the bidder. Due to the Contractor`s fault and after the contract time has expired, it has incurred a negative slippage of ten percent (10%) or more in the completion of the work. One (1) Year Blacklisting 02/17/2020 - 02/18/2021
62 BONUM Manpower & General Services, Inc. Department of Science and Technology - Technology Application and Promotion Institute Procurement of Janitorial Service for TAPI 4.2(b) of the Uniform Guidelines for Blacklisting - "Failure to fully and faithfully comply with its contractual obligation". Violation of item No. 18 of the contract between TAPI and BONUM dated 31 January 2017 - Non-payment of salary and statutory benefits of Bonum Manpower & General Services, Inc. Janitors and Janitress assigned to TAPI: (1) their salary for the month of December 2019. (2) their five (5) days incentive for 2019; and (3) their 2017 13th month pay pro-rated for two (2) months, despite the fact that TAPI has already paid your company for the December 2019 janitorial services as validated by LDDAP ADA No. 2019000768 dated 16 December 2019. One (1) Year Blacklisting 02/21/2020 - 02/20/2021
63 Apo Philtrade and Trading Services, Inc. (APTSI) Philippine Navy Supply and Delivery of Construction Materials for the Rehabilitation of CAPT SUAREZ Pier (Phase 1 & 2) Termination of the contract in whole due to default pursuant to Section III (A)(a), Annex I, RIRR of RA 9184 (Guidelines of Termination of Contract). One (1) Year Blacklisting 03/01/2020 - 03/01/2021
64 DCMS Trading and Construction Authority of the Freeport Area of Bataan Construction of Standard Factory Building (SFB-16) a.) Termination of contract due to the default of the contractor pursuant to Appendix I (Guideline on Termination of Contracts) in relation to Sec. 6.0 of Appendix 17, of the RIRR of R.A. 9184 (Uniform Guidelines for Blacklisting) - Contract was terminated for default of contractor and Order of Termination of Contract was issued on 26 February 2020 and duly received by the contractor`s representative on 03 March; and b.) Poor performance by the contractor due to its own fault or negligence having incurred negative slippage of more than 15% during the contract implementation stage and more than 10% negative slippage after the contract time has expired (4.2.f.i Appendix I) - There was a negative slippage of 18.506%. One (1) Year Blacklisting 03/10/2020 - 03/09/2021
65 Massnetworks Services Inc. Philippine Navy Procurement of NAVSENS and COMPLEX Equipment of LC291, LC293, LC295, LC296, and LC501 Termination of the contract in part due to default pursuant to section III (A)(a), Annex I, RIRR of RA 9184 (Guidelines on the Termination of Contract) One (1) Year Blacklisting 03/09/2020 - 03/09/2021
66 Naniwa Marine and Industrial Supply Philippine Navy Supply and Delivery of Carry On-Board Spares for Auxiliary Machineries of 78 Footer Patrol Craft Termination of the contract in part due to default pursuant to Section III (A)(a), Annex I, RIRR of RA 9184 (Guidelines on the Termination of Contract) One (1) Year Blacklisting 03/09/2020 - 03/09/2021
67 Zamasco General Services and Enterprises Philippine Navy Continuous Maintenance Availability (CMAV) of LS551 Termination of the contract in part due to default pursuant to section III (A)(a), Annex I, RIRR of RA 9184 (Guidelines on the Termination of Contract) One (1) Year Blacklisting 03/18/2020 - 03/18/2021
68 JO Builders Office of the ACofAS for Logistics, A-4, Headquarters Philippine Air Force, Armed Forces of the Philippines PAF Contract Nr PAFPC-CDS-18-230, for the renovation of Group Operations Center, TOG 9 in the amount of One Million Seven Hundred Forty Thousand Three Hundred Thirty Pesos only (PhP1,740,330.00). The contractor abandoned the project. One (1) Year Blacklisting 03/19/2020 - 03/19/2021
69 CVAP Construction Office of the ACofAS for Logistics, A-4, Headquarters Philippine Air Force, Armed Forces of the Philippines PAF Contract Nr PAFPC-CDS-16-131 Renovation of 220th AW Warehouse in the amount of Five Million Seven Hundred Seventy Thousand Two Hundred Forty Pesos only (PhP5,770,240.00). The Contractor failed to complete the project despite the several time extensions granted by the Procuring Entity and has incurred an accumulated 19% negative slippage. One (1) Year Blacklisting 04/14/2020 - 04/14/2021
70 Macro Construction Equipment Office of the ACofAS for Logistics, A-4, Headquarters Philippine Air Force, Armed Forces of the Philippines PAFPC-CDS-18-12 Procurement of Two (2) Units Bus of 420th SW in the amount of Eleven Million Nine Hundred Ninety – Seven Thousand Seven Hundred Pesos only (PhP11,197,700) The Supplier failed to deliver the items specified in the Contract and such failure amounted to accumulated liquidated damages of at least 10% of the contract price. IF did not comply with the Technical Specifications of the two (2) unit bus. The PAF required a sub-engine for the air–conditioning unit of the bus but the Supplier delivered a single - engine bus. One (1) Year Blacklisting 04/16/2020 - 04/16/2021
71 Alvynna Trading and Construction Office of the ACofAS for Logistics, A-4, Headquarters Philippine Air Force, Armed Forces of the Philippines PAF Contract Nr PAFPC-CDS-18-211 Renovation of PAFPC-CDS-18-211 for the Renovation of PAR 3 Hotel Building at FAB, Lipa City in the amount of Three Million Five Hundred One Thousand Pesos only (PhP3,501,000.00). The Contractor failed to complete the project despite the several time extension granted by the Procuring Entity and has incurred an accumulated 25.73% negative slippage. One (1) Year Blacklisting 04/16/2020 - 04/16/2021
72 KIN JOY CONSTRUCTION AND SUPPLY Department of Agriculture - Regional Field Office I CY 2018 Provision of labor, materials, and other incidentals needed for the repair / rehabilitation of employees quarter at DA - INREC Station, Batac City, Ilocos Norte (Phase I) a. Due to contractor`s fault and while the project is ongoing, it has incurred negative slippage of 95%; b. Due to the contractor`s fault and after the contract time has expired, it has incurred a negative slippage of 95%; and c. The contractor abandoned the construction works without authority and notice to the Department of Agriculture Regional Field Office I (DA - RFO I). Two (2) Years Blacklisting 05/01/2019 - 04/30/2021
73 ZMC General Construction Department of Agriculture a. Supply of Labor and Materials for the Establishment of Lias Agricultural Tramline. b. Supply of Labor and Materials for the Establishment of Apa-Labayan Agricultural Tramline The contractor abandons the contract works, refuses or fails to comply with a valid instruction and fails to proceed expeditiously and without delay despite a written notice by this office. Two (2) Years Blacklistin 05/16/2019 - 05/16/2021
74 ACS Development and Property Managers, Inc Chief of Staff and Vice Chief of Staff** - Armed Forces of the Philippines 1. Design and Build of Two (2) Storey Infectious Building**
2. Construction of CAS / CSS School Building (Contract Nr 113CO-2011-015)
3. CAS 2 School Building (Contract Nr 113CO-2013-001)
4. Construction of CSSS / TDC (Contract Nr 113CO-2011-016)
5. Construction of Student Officers Quarters Building Nr 3 (Contract Nr 113CO-2011-022)
6. Construction of Student Enlisted Personnel Quarters Building Nr. 3 (Contract Nr 113CO-2011-025)
7. Construction of of Enlisted Personnel Quarters Building Nr 1 (Contract Nr 113CO-2011-017)
8. Construction of Enlisted Personnel Quarters Building Nr. 4 (Contract Nr 113CO-2011-021)
9. Construction of Enlisted Personnel Quarters Building Nr 2 (Contract Nr 113CO-2011-026)
10. Construction of Gymnasium (Contract Nr 113CO-2011-014)
11. Design and Build of Two (2) Units Acute Ward (Ward 25)**
1. Incurred a Negative Slippage of 23.49% as of February 13, 2019; and b. Does not execute the works in accordance with the Contract or persistently or flagrantly neglects to carry out its obligations under the contract.**
2. Failure to fully and faithfully comply with its contractual obligations and the written lawful instruction of the Procuring Entity or its representative in the proper implementation of the contract without valid cause; b. Poor performance / unsatisfactory quality and progress of work due to the fault of the Contractor as reflected in the Constructor`s Performance Evaluation System (CPES) rating sheet issued by DPWH and the existing performance monitoring system of the Procuring Entity; and c. Willful / deliberate abandonment / non - performance of the project resulting to substantial breach thereof without lawful / just cause.
3. Incurred a Negative Slippage of 69.97% as of February 13, 2019**
Two (2) Year Blacklisting 07/30/2019 - 07/29/2021
75 Melisa R. Ramirez, EXA ATTO Builders, Inc. Nueva Vizcaya State University (NVSU) Construction of Citrus Resources Development Center Building a.) Incurrence of a Negative Slippage of 60.23% in the completion of the work, after the contract time has expired due to the contractor`s fault; and b.) Failure of the contractor to execute the Works in accordance with the contract, and persistently or flagrantly neglecting to carry out its obligations under the contract. Two (2) Years Blacklisting 08/05/2019 - 08/04/2021
76 Dent Precision Import Enterprise and Dental Services and JAC Automobile International Philippines, Inc., Joint Venture Department of Health - Office of the Secretary Procurement of Brand New Mobile Dental Vehicle under IB No. 2018-300 Submission of bids that contain false information or falsified documents, or the concealment of such information in the Bids in order to influence the outcome of eligibility screening or any other stage of the public bidding. Two (2) Years Blacklisting 10/09/2019 - 10/09/2021
77 Mr. Raul B. Manuel - Project Manager, 2R Builder Nueva Vizcaya State University (NVSU) Construction of Academic Classrooms a. Incurrence of a Negative Slippage of 49-80% in the completion of the work after the contract time has expired due to the contractor`s fault and
b. Failure of the Contractor to execute the works in accordance with the contract, and persistently or fllagrantly neglecting to carry out its obligations under the contract.
Two (2) Year Blacklisting 11/04/2019 - 11/03/2021
78 Tomas B. Binbinon, Jr., Project Manager, Sharysu Builders and Marketing Nueva Vizcaya State University (NVSU) Construction of Training Center Annex Building (Bayombong Campus) a.) Incurrence of a negative slippage of 33.76% in the completion of the work, after the contract time has expired due to the contractor`s fault; and b.) Failure of the contractor to execute the works in accordance with the contract, and persistently or fragrantly neglecting to carry out its obligations under the contract. Two (2) Years Blacklisting 12/26/2019 - 12/25/2021
79 Tomas B. Binbinon, Jr., Project Manager, Sharysu Builders and Marketing Nueva Vizcaya State University (NVSU) Repair of Existing REBD Left Wing (Bayombong Campus) a.) Incurrence of a negative slippage of 51.98% in the completion of the work, after the contract time has expired due to the contractor`s fault; and b.) Failure of the contractor to execute the works in accordance with the contract, and persistently or fragrantly neglecting to carry out its obligations under the contract. Two (2) Years Blacklisting 12/26/2019 - 12/25/2021
80 Apo Philtrade and Trading Services, Inc. (APTSI) Philippine Navy Continuous Maintenance Availability (CMAV) of LS551 Termination of the contract in part due to default pursuant to section III (A)(a), Annex I, RIRR of RA 9184 (Guidelines on the Termination of Contract) Two (2) Years Blacklisting 03/18/2020 - 03/18/2022
81 JO Builders Office of the ACofAS for Logistics, A-4, Headquarters Philippine Air Force, Armed Forces of the Philippines PAF Contract Nr PAFPC-CDS-18-231, for the Repair and Renovation of BOQ–1 #9004-01 at EAAB in the amount of Four Million One Hundred Fifteen Thousand Pesos only (PhP4,115,000.00). The contractor abandoned the project and with an accumulated negative slippage of 98.909%. Two (2) Years Blacklisting 03/19/2020 - 03/19/2022